1. Traffic regulations due to works on the Nicosia - Limassol motorway
The Project Engineering Office of the Nicosia Perimeter Motorway, Public Works Department, Ministry of Transport, Communications and Works, announces that on Saturday 3 September, 2022, from 6:00 a.m. to 12:00 p.m:00 noon of the following day, as part of the construction of the Nicosia peripheral motorway Phase AI, traffic on the Nicosia - Limassol motorway, which is carried out in 4 lanes on the east side, will be shifted to the west side of the existing motorway.
Traffic on the existing motorway from Limassol to Nicosia and vice versa will be carried out in 2 lanes instead of 3 for a length of approximately 2 km on the western side of the existing motorway. Traffic from the exit of the Idalios industrial area to the Cerios bypass will be uninterrupted, while traffic from the Cerios bypass to Nicosia via the motorway will not be conducted. Traffic from the Cheriou bypass to Nicosia will be conducted via the old Nicosia - Limassol road from the JCC light-controlled junction.
Traffic from the motorway towards Limassol to the industrial area of Idalios will be conducted via the new exit constructed as part of the Perimetric Project, while traffic from the industrial area of Idalios to the existing motorway towards Limassol will be uninterrupted.
During the execution of the works, traffic on the motorway from Nicosia to Limassol and vice versa will be restricted to one lane. Traffic from the Cheriou bypass to the existing motorway in the direction of Nicosia and from the industrial area of Idalios to the existing motorway in the direction of Limassol will not be conducted during these hours. Note that traffic from the Cheriou bypass to Nicosia will be conducted via the old Nicosia - Limassol road from the light-controlled junction near the JCC. Traffic from the Idaliou industrial area to the existing motorway in the direction of Limassol will be conducted from the Kotsiatis entrance.
It is noted that the above arrangement will last for a period of approximately 5 months.
The public can be informed about the above planned works via the website www.traffic4cyprus.org.cy, which provides a cartographic illustration of the works and their impact on traffic during their execution.
2. Epavement repair works in Aglantzia
The Nicosia District Engineer's Office Nicosia Department of Public Works, Ministry of Transport, Communications and Works, announces that, from Monday 29/8/2022 to Thursday 1/9/2022, from 8:00 in the evening until 6:00 in the morning of the next day, pavement repair works will be carried out on Athalassa Avenue in Aglantzia (from the junction with El. Venizelos until the roundabout of Kyrenia Avenue) and on the road from Aglantzia to Geriou near the Athalassa Park.
During the execution of the works, parts of the affected roads will be closed for a length of approximately 1000m.
The Department of Public Works apologizes for the unavoidable inconvenience that will be caused and urges the public to demonstrate the necessary understanding and compliance with the temporary road signs and the instructions of the Police.
(ΕΠ/ΣΧ)
Contents of this article including associated images are owned by PIO
Views & opinions expressed are those of the author and/or PIO
Source