Bells 19 thousand euros to two companies Suspended imprisonment to the two persons responsible for a fatal work accident The decision and the reasoning
Two companies, following criminal prosecutions for breaches of health and safety at work legislation, which resulted in the fatal injury of an employer and endangered persons at work, were fined €19.000 and two persons to suspended imprisonment.
According to an announcement by the Labour Inspection Department, the Department advanced the criminal prosecution of the company "E.M. ATHANASIOU CONSTRUCTIONS & DEVELOPMENTS LTD" and the Limassol District Court sentenced it to a total fine of €19.000 for violations that caused the fatal injury of an employee[/B] and endangered persons at work.
In particular, she was convicted of failing to use suitable scaffolding for the work of removing mouldings from a 2nd floor slab on the north side of a building that had suitable working platforms, of sufficient dimensions and solid handrails on those scaffolds, at a sufficient height of at least 1.10 metres from the floor, having a parapet or other barrier at floor level at least 0,15 metres high, a handrail and a horizontal element such that the distance between the parapet or other barrier and the handrail or other horizontal element does not exceed 0,45 metres, or use other equivalent means to prevent persons from falling from a height.
He was also convicted of failing to determine the precautionary and protective measures to be taken based on a written assessment of the hazards present at work, especially those involving work at height, and of failing to provide adequate instructions and supervision for the work of removing formwork from floors of a building under construction.
The second company to be fined a total of €19,000 is "D.T.A. ATHANASIOU CONSTRUCTIONS LTD".
Specifically, the second company was convicted for failing to ensure that the company, which was subcontracted to carry out formwork work, applied safe working methods in carrying out the work of removing the moulds from a 2nd floor slab on the north side of a building such as (a) using appropriate work scaffolding and failing to place suitable work platforms of sufficient dimensions and solid handrails on such scaffolding, of sufficient height, at least 1.10 metres from the floor, having a parapet or other barrier at floor level at least 0.15 metres high, a handrail and a horizontal element so that the distance between the parapet or other barrier and the handrail or other horizontal element does not exceed 0.45 metres or use other equivalent means to prevent persons from falling from a height.
He was also convicted of failing to take steps to ensure that the safety and health plan together with the written risk assessments were available at the construction site and failing to ensure that the safety and health plan was updated in good time to include in that plan the working method and technical measures required, based on the written risk assessment, to carry out work at height such as the removal of formwork (mouldings) from the ceiling slabs of the floors of a block of flats.
He was further convicted of failing to ensure that the execution coordinator, whom he appointed, carried out his duties and, inter alia, coordinated the application of the general principles of prevention and safety with regard to the organisation of work and technical choices at the construction site, the implementation of the safety and health plan and safe working methods established on the basis of the written risk assessment and the cooperation between contractors and subcontractors on the site and the activities for the protection of persons at work and the prevention of accidents.
The Court also sentenced a person involved to 6 months' imprisonment with three years' suspension and another person involved to 4 months' imprisonment with three years' suspension for failing to take the necessary steps to use suitable scaffolding for the work of removing mouldings from a 2nd floor slab on the north side of a building, for failing to take the necessary measures, namely to determine the precautionary and protective measures to be taken on the basis of a written risk assessment, in particular for the work involving work at height.
They were also convicted of failing to take the necessary steps to ensure that a subcontractor applied safe working methods to carry out work to remove mouldings from a 2nd floor slab on the north side of a building, for failing to take the necessary steps to ensure that the health and safety plan together with the written risk assessment was available on site.
The conviction also concerns failure to ensure that the safety and health plan was updated in good time to include in that plan the working method and technical measures required on the basis of the written risk assessment for the execution of the work at height and failure to take the necessary measures, namely to ensure that the execution coordinator carried out his duties and, inter alia, coordinated the application of the general principles of prevention and safety with regard to the organisation of the work and the technical choices at the construction site